Helping a family-run construction firm turn ten years of work into a winning RFP

A two-person, father-and-son firm had managed this work for the same board for about ten years. When the contract went to open tender, with a French RFP and 14 days to the deadline, that experience had to be written down in a form an evaluator could score.

A timber-framed building under construction, with a tower crane overhead
Illustrative photo: Salvador Rios on Unsplash

The problem

The firm is a two-person, father-and-son business. For about ten years it had managed school facility projects for the same board, and much of that work had come through relationships and referrals. This time the contract was open to anyone, and the firm had to win it on paper.

The RFP was in French, with 14 days to the deadline. It had a strict evaluation structure: 100 points, and a minimum score on the project manager's CV, below which the whole bid is out. Both owners were running live projects and had no time to work through the process.

The path

  1. Read the RFP line by line. Every requirement, scoring criterion and mandatory form was translated and mapped to a document in the submission package.
  2. Build the evidence. Ten years of work was spread across emails and memory. We pulled it into named projects with scope and contacts, then picked the two references that best matched what the board was asking for.
  3. Write to the scoring, not the story. Each section was written for an evaluator with the rubric open: specific projects, the board's own scope language, and plain statements of what the firm does on site.
  4. Keep the family firm visible. The proposal leaned on what a two-person team offers: one owner leading every project, the other coordinating, and no handoffs.
  5. Check before upload. A compliance map confirmed that every mandatory item, scored criterion and portal field was covered before submission.

The solution

A complete submission package, uploaded ahead of the deadline:

  • A cover letter in the owner's own voice
  • The main proposal: company profile, two project references, project manager qualifications and methodology
  • A standalone CV for the project manager
  • The completed scoring questionnaire
  • The pricing form and signed submission form

The result

The firm won the contract.

Takeaway

Firms that win on relationships can lose on paper. A formal bid needs the relationship translated into evidence an evaluator can score.