On many bids, the most senior person involved ends up doing a little of everything: reading the RFP, chasing CVs, rewriting the cover letter, fixing the table of contents the night before. The decisions that actually set the value of the contract get whatever attention is left.

It helps to separate the bid into two kinds of work. Some decisions commit the firm, and leadership should own them. The rest is production, and it can belong to someone else.

1. Whether to bid at all

This is the decision with the most money attached, and it is usually made in the shortest time. A bid that should not have gone out costs the hours spent on it and, if it wins, the margin it loses in delivery.

Leadership knows what else the team could be doing, what the firm can deliver well, and which clients matter. Make this call deliberately, early, and in writing, even if the answer is a quick yes.

2. The price, and what it assumes

Someone can build the pricing sheet. Leadership should decide the number and, just as important, sign off on the assumptions underneath it: hours, staffing, travel, response times, subcontractor rates.

A price is only as good as the promises it covers. If the requirements commit you to something the price does not include, that gap becomes your problem after award.

3. Which risky promises to accept

Every RFP contains a few requirements that carry more weight than they look: service levels, penalties, warranties, insurance, liability caps, unusual reporting. Somebody needs to read them and decide, knowingly and with your legal team's advice, whether the firm accepts each one, asks a question about it, or walks away.

That is a leadership decision because it is a decision about risk the whole firm will carry.

4. Who leads delivery if you win

Evaluators read your proposed team closely, and so does the client after award. Naming the delivery lead is a commitment about who will be busy for the next year or more. Leadership is best placed to weigh that against the rest of the work the firm has promised.

5. The final sign-off

Before submission, someone should read the whole response as the client will, with one question in mind: is everything in here something we are prepared to do at this price? The person who signs the bid should be the person who reads it this way.

Everything else can move

Once those five are protected, look at the rest of the bid and ask who else could do each piece. Formatting, assembling attachments, chasing signatures and certificates, building the compliance matrix, drafting standard sections, checking page limits and submission rules: all of this matters, and none of it needs leadership.

If there is no one inside the firm to take it, that is useful to know. It may point to a coordinator, an outside bid lead for the bigger pursuits, or simply fewer bids.

Why this is about more than efficiency

For most senior people, the bid lands on top of everything else they carry: live contracts, clients, the team and its workload. When they do all of it, the decisions that matter get the tired hours.

Keeping leadership's part of the bid small and clear protects the quality of those decisions. It also protects the people making them, which a firm that wants to bid for years should care about.

A quick check for your next bid

Write the five decisions at the top of the bid plan, with a name and a date beside each. Then list every other task with someone else's name on it. If the same senior name ends up on most of the list, the plan is telling you something, and it is better to hear it before the deadline than after.

Akili Etefia is the founder and principal of Kenley Pursuit. Akili spent about five years in proposal and bid management on more than 100 public-sector proposals, including proposal pricing and evaluation, after beginning their career in audit training. More about Kenley Pursuit

Questions

What if nobody else on the team can take the rest?

Then write down what the rest is, task by task, and how long each takes. That list is the case for a dedicated role, an outside bid lead, or bidding less often. Without it, the work stays invisible and lands on whoever is most senior by default.

Who exactly is leadership on a bid?

The person who will answer for the margin and the delivery: often a VP, a general manager or the head of the business unit doing the work. Give that person real authority and the numbers to work with. The price and the final sign-off are the hardest to hand over, because they commit the firm.