Most advice on proposals assumes a quiet week and a closed door. Most senior people never get one. Live contracts keep needing decisions, the team still needs answers, and the bid has to fit between them.
A bid can still get done in that week. It needs a plan built on the time that actually exists.
Start with the decisions, not the document
A proposal looks like one large writing job. For the people leading it, it is mostly a short list of decisions with writing around them. Before anyone opens a blank page, write down the calls only leadership can make on this bid:
- Whether to bid at all, and what a win would cost the business to deliver
- The price, and the assumptions it rests on
- Which promises in the requirements you are willing to sign
- Who leads delivery if you win
- Final sign-off before submission
Each of those deserves real attention. Very little else on the bid does, at least from you.
Sort the work by the size of block it needs
Once the decisions are listed, sort every task by how much uninterrupted time it needs. Three sizes cover nearly everything.
15 minutes. Small, contained tasks you can finish between other things: answer a clarification question, confirm a reference will take a call, approve a CV, check a form is signed. These fit into the gaps of an ordinary day, on a phone if needed.
30 minutes. Focused work with one clear output: read one section of the requirements and mark what it commits you to, review one drafted answer, decide on one staffing question. Most people can find two or three of these a day, between meetings.
60 minutes or more. The work that falls apart if it is interrupted: building or checking the price, deciding which risky requirements to accept, and the final read before submission. You may only get one or two of these in a week. Spend them here and nowhere else.
The common mistake is the reverse: using the rare long stretch to tidy formatting, then making the pricing call at 11 pm in a 20-minute gap.
Book the long blocks first
Look at the deadline and work backwards. Put the pricing block and the final review block in the calendar before anything else, and treat them like a client meeting. If the only quiet hour is first thing in the morning, that is where they go.
Then place the 30-minute blocks around them, with the requirements read near the start so problems surface while there is still time to ask questions. The 15-minute tasks will find their own gaps.
If you cannot find room for the long blocks at all, take that seriously. It usually means the bid is bigger than the time available, and the cheapest moment to notice is now.
Make every block restartable
Short blocks only work if you can pick up where you left off. End each one by writing a single line: what you decided, and what the next block needs to do. Keep those notes in one place the team can see.
This also makes the bid less dependent on your memory, which matters on the days when the plan collapses and someone else has to carry a piece forward.
Hand off what does not need you
Short blocks make it obvious how much of a bid is not leadership work: formatting, collecting certificates, chasing signatures, assembling the submission package, checking page limits. If someone on the team can do it, or someone outside the firm can, let them. Your blocks are for the decisions that change what the contract is worth.
Plan the week after, too
Submission week has a cost that rarely makes it into the plan. If a bid has eaten your evenings, the week after is when delivery work and rest catch up. Leave some room for that before the next bid starts. A firm that bids regularly needs a pace it can keep, and the time of the people leading the bids is part of that pace.
A simple test before you commit
Before saying yes to the next bid, put the long blocks in the calendar first. If they fit, the bid is probably manageable. If they only fit by cancelling things that matter, the bid is telling you what it really costs, and that belongs in the go or no-go decision alongside the price.
Questions
How much leadership time does a typical RFP response need?
It depends on the bid, so count it rather than guess. List the decisions only you can make, give each a block, and add a review block near the end. If that adds up to more time than you have before the deadline, that is useful information for the bid decision itself.
What if the deadline does not leave room for short blocks?
Then the bid is asking for a stretch of time you may not have. Ask whether the extra hours come from live contracts, from other bids, or from evenings, and decide on purpose. Sometimes the right answer is to pass.
Should the whole team work in short blocks too?
The people writing long technical sections usually need longer stretches. Short blocks suit leadership's part: decisions, reviews and sign-offs. Plan the writers' time separately and protect it.